Skip to content

End of year knitting

I’m going to try and finish a bunch of WIPs by the end of the year. This is just a to-do list/statement of intent/whatever.

1. Pinwheel sweater

The body is complete and has a 10st garter lace edging. The sleeves are started and are about halfway to the elbows — just enough to let me try it on as it was growing. So I need to finish the sleeves and do the lace on the cuffs. Bob says I can block it at her place.

pinwheel sweater-coat-thingy

Estimated: 2-3 evenings to finish. Pinwheel sweater project on Ravelry.

2. Mitre mittens

These have been sitting mostly-done for months. I need to finish the main body of the second mitten, and add thumbs to them.

Mitred mittens

Estimated: 1 evening. Mitred mittens project on Ravelry.

3. Grounded scarf

More than halfway there. Just needs me to slog through it and get it done.

Scarf (in progress)

Estiamted: 2 evenings. Grounded scarf project on Ravelry.

4. Hanging hand-towel

A cotton hand-towel with a loop and button to hang it by the kitchen sink. It’s about half done, but I hate knitting with cotton and it hurts my hands, so I can’t spend a solid chunk of time on it. So I plan to do a bit each day. No Rav project yet.

5. Blue mittens

I knit a hat (Rav link, but I don’t have a photo yet) recently out of Manos del Uruguay Wool Clasica (which is roughly aran weight) and have enough yarn over for a matching pair of mittens. I estimate 1-2 evenings.

So that’s a total of 8 evenings (using the higher counts for everything) and there’s 7 evenings left in the year. Sure, I’ll probably not be knitting on New Year’s Eve, but on the other hand, I don’t have much going on at any other time, so there’s lots of flexibility there.

Wish me luck. I’m looking forward to knocking some WIPs off the list.